A pair of 5-storey commercial building which was amalgamated and undergoing A&A including an additional mezzanine floor.
Architecture
Schedule of Finishes:
All units are self-levelling screed to floor, skim coat to wall, and bare ceiling C&S
Floor loading = 2kN / sqm
M&E: q
For Level 1 unit (F&B):
1. ACMV
- Kitchen exhaust duct only
- Kitchen fresh air duct only
2. Plumbing/ Sanitary
- Toilet water supply and drainage
- Kitchen drain with Grease interceptor
3. Elec/ Tel
- 125A Elec isolator
- 1 No 2-way air blown fiber duct cable system
- E lights
For L2-L5 & L5mezz unit (office) :
1. Plumbing/ Sanitary
- Toilet water supply and drainage
2. Elec/ Tel
- 40A Electrical Isolator (Except L5 unit, 63A elec isolator)
- 1 No 2-way air blown fiber duct cable system
- E lights
*Building Naming & Uses of the property are subjected to obtaining approval from the Relevant Authorities
Contact: MAX 9151*8448 PropNex for viewing