12 units with mezzanine rest area (ramp up) 12 flatted units with rest area
Total 24 units
Floor loading 10kN/m2
Electricity provision 100 Amp (3 phase)
Dedicated refuse and exhaust chute
Dedicated sampling sump and common grease trap
Building Specifications
Two-way driveway ramp from level 1 to level 6 Common Loading/Unloading Bay at level 1
Common Loading/Unloading bay for units with ramp up 13 carpark lots at level 4
Bicycle parking
2 passenger lifts
2 goods lifts (3000kg)