BASIC INFORMATION:
5I Corner
North-East facing
1,302 sqft
Near major school, MRT and amenities
Completed HOME IMPROVEMENT PROGRAMME (HIP) primarily the essential improvements and optional improvements along with Enhancement for Active Seniors (EASE) on December 3, 2018. Cost has been fully paid for in early January.
Essential improvements include:
1. Toilet upgrading package including wall and floor tiles replacement and waterproofing of floors.
2. Application of EASE slip-resistant treatment to floor tiles of toilets although treated tiles may require frequent cleaning.
3. Provision of grab bars.
4. Replacement of cast iron waste/soil pipes.
5. Repair of spalling concrete and structural cracks.
6. Replacement of pipe sockets with clothes drying rack.
7. Replacement of entrance door.
8. Replacement of entrance gate.
9. Upgrading of electrical supply to facilitate or support the power from 2 split air-con compressors by replacing the cables from the meter box outside the flat to the consumer unit within the flat.
10. Installation of comprehensive shower curb for both toilets at additional cost outside the HIP.
Call Chris Eng @ 9665XXXX for viewing appointment now